For an R1 Research University, hardware isn’t usually the problem, scheduling is. Our client approached Metranis with a familiar crisis: a frustrated user base and a cluster that appeared busy but wasn't producing results.
The Diagnostics
The symptoms were severe. Researchers faced 96-hour queue times for simple debug jobs. This destroyed productivity loops; if a researcher made a coding error, they wouldn't know for four days.
Our analysis revealed the cluster was suffering from severe MPI fragmentation. The scheduler was holding resources for massive parallel jobs, but because the jobs couldn't find contiguous nodes, the hardware sat in a "reserved but idle" state. The cluster was technically 72% utilized, but effectively gridlocked.
The Fix: Advanced Scheduler Tuning
Metranis implemented a three-pronged configuration change within Slurm to break the deadlock:
Aggressive Backfill Scheduling: We tuned the scheduler to look further ahead. This allowed the system to squeeze short, small jobs into the windows where nodes were sitting idle, waiting for large MPI jobs to aggregate.
Strategic QOS Implementation: We introduced a strict "Debug" QOS. This gave high priority to jobs under 30 minutes, ensuring researchers could debug code in real-time.
Fairshare Decay: We adjusted the priority decay half-life to ensure that heavy users from the previous week didn't starve out new jobs in the current week.
The Outcome
The configuration was pushed on a Tuesday. By Thursday:
Total Utilization: Jumped from 72% to 94%.
User Satisfaction: Tickets regarding wait times dropped to near zero.
By optimizing the logic rather than the hardware, Metranis unlocked the equivalent of dozens of new compute nodes for the price of a consultation.